Dfdm design report template

image of book

INDEX A-Z

Search

Instagram icon X icon facebook icon youtube icon

Subscribe to our FDOT Contact Management Subscription Service to receive the most current notices, bulletins, memoranda, and other important information. Submit FDOT Design Manual (FDM) questions by email to: DeWayne Carver, CNU-A

Developmental Criteria and Previous FDM Releases

2024 FDOT Design Manual - Complete FDM Document Download

To view the Implementation Bulletin for the current FDM, please see RDB 23-03.
Summary of Revisions

Development and Processes - Complete FDM Part 1 Download
ChapterTrainingBulletinErrata Description
Introduction
100 Introduction
Link Context Classification
102 Glossary of Terms
103 Standard Forms
104 Public Involvement
105 Aesthetic Design
106 Exempt Public Documents
Plans Development Processes
110 Initial Engineering Design Process
111 Final Engineering Design Process
112 Update Engineering Design Process
113 Right of Way Requirements
114
Resurfacing, Restoration, and Rehabilitation (RRR)
115 Standard Plans and Standard Specifications
116 Alternative Intersection and Interchange Review
117 Monitor Existing Structures
Plans Submittal, Review, and Processing
120 Design Submittals
121 Bridge Project Development
122 Training
Design Exceptions and Design Variations
123 Engineering Design Estimate Process
124 QA/QC Management Plan
125 Quality Assurance
126 Lane Repurposing Projects
127 RDB 24-02 Community Aesthetic Features
128 Federal Aid Project Certification
Final Plans Processing
130 Signing and Sealing Documents
131 Plans Processing
132 PS&E Submittal Package Revisions
133 Retention of Electronic Documents
Lump Sum Projects
140 Lump Sum Projects
Post-Design Processes
150 Consultant Priority Matrices
151 ErrataRevisions Packages
152 Shop Drawing Submittals
Design Criteria - Complete FDM Part 2 Download
Chapter TrainingBulletinErrataDescription
Context Based Design
200 Context Based Design
201
Design Controls
202 Training Speed Management
Roadway Geometrics
210 Training
Arterials and Collectors
211 Training Limited Access Facilities
212 TrainingRDB 24-02
Intersections
213 Training Modern Roundabouts (Roundabout Design Aids)
214 Driveways
215
Roadside Safety
216
Earthwork
D217 Developmental Design Criteria: Diverging Diamond Interchanges
Other Facilities
220 ErrataRailroads
221 Utilities
222 RDB 24-02
Pedestrian Facilities
223 TrainingRDB 24-02 Bicycle Facilities
224 Training Shared Use Paths
225 Public Transit Facilities
226 RDB 24-02
Patterned Pavement and Architectural Pavers
227 Freight - U nder Development
228 Chapter Replaced with 270 Series
229 Chapter Replaced with 270 Series
Traffic Design
230
Signing and Pavement Marking
231
Lighting
232 Signalization
233 Intelligent Transportation Systems (ITS)
Temporary Traffic Control
240 Transportation Management Plan (TTC Forms)
241 Lane Closure Analysis
242 Traffic Pacing Design
243 Portable Changeable Message Signs
Drainage and Permits
250 Hydraulic Data and Agency Permits
251 Stormwater Runoff Control Concept (SRCC) Development
Structures
260 Bridge Structures
261

Structural Supports for Signs, Signals, Lighting, ITS, and Tolling
262
Retaining Walls
263 Geosynthetic Design
264 Noise Walls and Perimeter Walls
265 Reinforced Concrete Box and Three-Sided Culverts
266
Bicycle and Pedestrian Bridges
267 Shop Drawing Submittals - Now FDM Chapter 152
Landscape
270 Planting Designs
271 Irrigation Designs
272 Hardscape Designs
273 Landscape Maintenance Guide
274 Selective Clearing and Grubbing
275 Tree and Palm Relocation
276 Outdoor Advertising Signs
300 Series has been sunset. See 2022 FDM for final version.
NexGen Plans Production - Complete FDM Part 9 Download
ChapterTraining BulletinErrataDescription
NexGen Roadmap
Crosswalk from Traditional Plans Production to Model-centric Plans Production
Plans Production
900 Production of NexGen Plans
901
Sequence of Plans Preparation
902 Estimated Quantities Report
904 Landscape Opportunity Plan
905
Roadway Cross Sections
906
Bridge Hydraulic Recommendations Sheet
907
RFP Concept Plans
908 Stormwater Runoff Control Concept Worksheet
Roadway Plans Set
910

Key Sheet and Signature Sheet
911 Model Management Sheet
912 Project Control
913 Typical Sections
914 General Notes
915 Roadway Plan-Profile Sheet
916 Drainage Structures Sheet
917 Stormwater Facilities
918 Drainage Map
919 Lateral Ditches
920 Soil Survey Sheet and Boring Coring Data
921 Temporary Traffic Control Plan
922 Miscellaneous Structures
923
Utility Adjustments
924 Selective Clearing and Grubbing Plans
Component Plans Set
940 Signing and Pavement Marking Plans
941 Signalization Plans
942 Intelligent Transportation Systems (ITS) Plans
943
Lighting Plans
944
Landscape Plans
945 Architectural Plans - TBD
946 Structure Plans - TBD
947 Toll Facilities Plans - TBD
948 Utility Work by Highway Contractor (UWHC) Plans

FDOT

Useful Links

instagram icon X icon facebook icon youtube icon

Contact Us

Our Newsroom

Providing timely responses to inquiries from the press, government officials, and the public is a crucial function of the Florida Department of Transportation. You can find recent press releases, public notices, media contacts, links to our social media pages and newsroom.

© 1996 ‐ 2022 Florida Department of Transportation